The goal was to replace an old system and digitize the interface for sequence calls.
» Requirements
- 7 interfaces (sequence calls, tachometer, long & short forecast, assembly data, ASN goods receipt and goods issue)
- Digital process control in manual assembly in sequence
- Sequencing of assemblies and cable harnesses (reverse order and route-optimized)
- Customized sequence labels
- Special tool for determining the appropriate cable harness for the vehicle variant
- JIS/JIT loading with digital shipping notification
» Results & Highlights
- Successful implementation, including a special development and the expansion of the product to include the assembly function, within 6 months
- Significant optimization of intuitive user guidance compared to the previous system